Situation A
|
|
![]() PRE DEVELOPMENT - Thrasher Engineering |
|
![]() POST DEVELOPMENT - Greenleaf Engineering |
|
Building: C --- A very noticeable Small parking lot area is evident. The corner of the Developers Building C was to be approximately 66 FEET from the property line. (Curb 16'). The curb was to be 55 FEET from the property line. A Fifty Foot Setback is shown in the engineering plan, which was within the guidelines of the then existing zoning. This plan was denied by the COB for a lack of 15 parking spaces; Per June 6, 1996 letter. |
Building: C --- A very noticeable Large parking lot area is evident. The corner of the Developers Building C is approximately 27 FEET from the property line. The curb Is 5 FEET from the property line. A Fifty Foot Setback DOES NOT EXIST, which violates the zoning that was in place in an extreme way. The end result of the approval given less than a month after the developer was denied Per July 1, 1996 COB minutes. |
Larger Plats:
|
Engineering Plan before Construction Thrasher Survey Larger Size |
Surveys after construction Greenleaf Survey Right Side |
Surveys after construction Greenleaf Survey Left Side |