PRE DEVELOPMENT The Thrasher
Engineering Plan

* A Fifty Foot Setback is shown in the engineering plan, which was within the guidelines of the then existing zoning.
* Building (C) 113 Platinum Drive illustrates a very noticeable Small Parking Lot Area.
* This plan was DENIED by the COB for a lack of 15 parking spaces. Per the
(left) June 6, 1996 COB letter. |
|
|

 |
| |
|
|
|
|
| July 1,
1996: Go Ahead Anyway |
|
The
Results |
|
Imagery |
 |
|
2003 POST DEVELOPMENT Greenleaf Engineering
Survey (What The July 1, 1996 Approval Led To)

|
* A Fifty Foot Setback
DOES NOT EXIST,
which violates the zoning that was in place in an extreme way.
* Building
(C) 113 Platinum Drive,
illustrates a very noticeable Large
Finished Parking Lot Area.
* Earthen fill was pushed against and then up a Generational Landowner's Locust Post Grid
Fence Line. A fence line which
became the lateral support for the development and its underground
utilities.
* The parking lot
the drainage
system was constructed with built-in restrictions, which allowed both
buildings roofs to be used as retention ponds.
|
|
|
The stage was now set for
Massive City Wide Destruction.
|
|

|
|